A full Guide to LED Screen Installation

Explore the steps for LED screen installation for multiple installation ways, and useful tips to ensure a smooth installation process.
LED Screen Installation

Would you like to know all the steps for LED screen installation?

Installing an LED screen is not an easy task, and the process might look complex. In this post, we will discuss the essential steps. While it may seem straightforward, there are common mistakes that can complicate the process.

We’ll break down the steps to show you how to navigate the installation efficiently, turning what looks like a daunting task into a simple and rewarding project. By the end of this guide, you’ll have the confidence to install your LED screen successfully!

In This Article

Type of Installation Ways

Before we explore the installation steps, it’s essential to have a basic understanding of the different installation ways, as each may require distinct s materials and steps.

Generally, when installing your LED screens, there are five primary types as follows to consider.

  • Cabinets mounted on a steel structure
  • Cabinets installed directly on walls
  • Cabinets positioned on brackets
  • Cabinets suspended from hanging bars
  • LED modules assembled directly onto a steel structure

Next, we conduct an in-depth analysis of each installation method.

Outdoor Installation with cabinet on a steel structure

The LED screen cabinet is a standalone display unit that comes pre-integrated with LED modules, power supplies, receiver cards, data cables, power cables, and HUB cards. This design allows operators to easily connect the cabinets together, much like assembling building blocks. Operators can efficiently create larger displays without the complexities typically associated with traditional setups.

fixed installation LED display cabinet structure

The advantages of this installation method are:

  • Cabinet-based installations provide enhanced protection for the LED modules, as the sturdy enclosures shield them from physical damage and environmental exposure.
  • The modularity of the LED cabinets simplifies the installation process.
  • Convenient for transportation.
  • Quick assembly and configuration.
  • Easy cable connection.
  • More stable, high protection for inner components.

Disadvantages:

  •  High cost.
  • Need more space.

Outdoor LED display installation using cabinets mounted on a steel structure requires meticulous planning and execution to ensure both functionality and durability. You need to consider which way (Single-column installation, double-column installation, wall-mounted installation, standing installation, hanging installation, etc) is more suitable for the location where the LED screen will be installed.

Step 1: Survey the site environment

Before installing your LED display, it’s essential to conduct a thorough survey of the intended location. You need to consider environmental factors and space factors that can accommodate the steel structure. You need to evaluate the building’s load-bearing strength to support the total LED display’s weight and dimensions securely.

Additionally, You will need to consider the following aspects of the location you chose for your LED screen:

  • Topographic factors
  • Chances of rain and storm
  • The max and min temperature
  • The max and min wind force
  • Ambient light
  • Potential obstructions like trees or buildings
LED Screen installation ways

Meantime, take into account power supply accessibility and network connectivity required for content updates.  

Step 2:Calculate the Size of the LED Screen

After completing the survey, the next step is to calculate the size of the LED display, including the dimensions of the cabinets and the total frame size. It’s crucial to ensure the installation site has sufficient space to accommodate both the frame and the LED display itself. 

Begin by determining the overall screen size needed for optimal visibility and impact. Then, consider the dimensions of each LED cabinet, adding them up to ascertain the full extent of the display area. 

Finally, incorporate the size of the supporting steel frame, ensuring stability and safety. 

Step 3: Prepare Material

Once you have surveyed the Location, next is to organize the LED cabinets, steel frames, and any auxiliary components required for integration, ensuring that everything is on-site before starting the installation to avoid interruptions. Some necessary tools and materials you need are as follows: 

  • LED screen cabinets
  • Power cable
  • Data Network cable
  • USB Control Cable
  • DVI/HDMI/VGA Cable
  • Steel Structure
  • Bolts
  • Connect plates
  • Spanner
  • Laptop
  • LED Controller or Video Processor
  • Welding equipment, power drills, fasteners, and safety gear like helmets and harnesses for workers
material and accessories for LED display installation

Step 4: Build the Frame According on Measurements

After completing the site survey and determining the ideal location for the LED screen, the next step is to build the frame based on the measurements obtained.

Using 4×4 cm or 4×8 cm rectangular tubes for the main structure, weld the pieces together to create a robust frame that can support the weight of the LED cabinets. It’s important to ensure that the frame is level and securely anchored to withstand environmental factors such as wind and rain.

Building the frame involves careful consideration of maintenance access, which is crucial for efficient servicing. If the design includes rear service access, ensure to leave maintenance channels of 600mm to 900mm in the frame, allowing technicians to easily reach and repair components from the back.

steel frame for LED display installation

On the other hand, if the display is front-serviceable, a dedicated maintenance room at the back may not be necessary.

Step 5: Fix LED cabinet on the Steel structure

Once the steel frame is securely built, the next step is to fix the LED cabinets onto it.

fixed installation LED display cabinet structure

LED Cabinet

LED display cabinet mounted on the steel frame

Steel Frame with LED Cabinet Mounted

Here are the basic steps for fixing the LED cabinets onto the steel frame:

  • Position the Cabinets: Carefully place each LED cabinet on the steel frame, ensuring proper alignment and levelness.
  • Temporary Support: Use temporary supports or clamps to hold the cabinets in place as you prepare for securing.
  • Attach Connection Plates: Secure the cabinets to the frame using connection plates behind the 40x40mm rectangular tube, ensuring they fit snugly against the frame.
  • Bolt the Cabinets: Use M10 x 60mm bolts pass through the connecting plate and the rectangular tube to fasten each cabinet to the frame at all connection points.
  • Evenly Distribute Bolts: Tighten bolts evenly across all connection points to avoid stress and ensure stability.
  • Inspect Connections: Check each cabinet to confirm that all connections are secure and that there are no gaps between the units.
  • Prepare for Wiring: Once secured, prepare to connect the necessary signal and power cables for the LED screen.
Fix LED cabinets to the frame using connection plates with steel tube

Fix LED cabinets to the frame using connection plates with steel tube

Finally, inspect each cabinet after installation to confirm that all connections are secure and that there are no gaps between the units. This inspection is crucial for ensuring proper weatherproofing and preventing moisture from entering the cabinets, especially in outdoor environments.

Once everything is securely fastened and inspected, you can proceed to connect the necessary signal and power cables, setting the stage for the configuration and testing of the LED screen.

Step 6: Connect AC Power Cable

After the LED cabinets are fixed on the steel structure, next is to link power cable to all cabinets.

To fix the AC power cable for the LED cabinet, start by identifying the two power connector ports, some cabinets are with labeled POWER IN and POWER OUT located on the back of the cabinet.

LED screen cabinet power connector port

Generally, there are two power connector ports in the cabinet. We use the AC power Cable to connect the power distribution box to the first cabinet. The first POWER port is designed to receive the main power supply, while another POWER port allows for daisy-chaining additional cabinets or connecting to the next unit in the series.  

AC Power cable connection with LED display

 After securing all connections, it’s essential to conduct a thorough inspection to confirm that everything is properly wired and safe before powering on the system. Here are some standards you need to follow: 

  • AC Power Cable: 3-core 2.5㎡.
  • Wiring configuration: typically, the brown wire should connect to live, the blue wire to neutral, and the yellow-green wire to earth.
  • Load of Power Cable: 3.6KW.

As you can see above, the load of power cable is generally about 3.6KW, so how many cabinets can one AC power cable load? 

To determine how many cabinets one power cable can load based on the given power capacity, we start with the total power that each cabinet requires. Here is a simple formula:

Assuming each cabinet has three 300W power supplies, the total power required for each cabinet would be calculated as follows:

Total Power of Each Cabinet=Number of Power Supplies×Power of Each Supply=3×300W=900W

Given that the load capacity of the power cable is approximately 3.6KW (or 3600W), we can then calculate the number of cabinets that can be powered by one cable:

Number of Cabinets=Total Load Capacity / Total Power of Each Cabinet​=3600W / 900W​=4

Thus, one power cable can support up to 4 cabinets with each cabinet requiring 900W of power. You can use the same formula for 200W Power suppliers.

Step 7: Connect Signal Cable

After the power cable is OK, the next step is to connect the signal cable to the LED display. It is a crucial step in ensuring that the content (Video, text, images, etc ) is transmitted effectively from the control system to the cabinets.

First, connect the laptop, which will serve as the primary source for the video signal, to the LED controller using the appropriate signal cables, which may include HDMI, DVI, or ethernet cable, then connect the output of the controller to the input of the first LED cabinet using the ethernet cables.

led display structure diagram

Once the first cabinet is connected, proceed to daisy-chain the signal to the subsequent cabinets. This typically involves connecting the output port of the first cabinet to the input port of the next cabinet, continuing this process until all cabinets in the installation are linked.

As we know, each output port of the LED controller has a value of Max pixel pitch loading capacity (Max pixel in width and Max pixel in height), so make sure the the total pixel pitchs of cabinets in series must in the range of that value.

Step 8: Configure LED Screen and Send Program

Once all physical connections are made, the next task is to power on the LED display and confirm that each cabinet is functioning correctly. This involves using debugging software to configure the LED screen, which typically comes with the LED control system.

Novastar NovaLCT Screen Configuration

LED Screen Configuration

Here is a list of software you can download to correspond with the control system your LED display uses.

  • Colorlight LED software LEDVsion, iSet, etc: For Colorlight control system. Download here.
  • Novastar LED software NovaLCT, SmartLCT, etc: For Novastar control system. Download here.
  • HUIDU LED software HDPlayer, HDSet, etc: For Huidu control system. Download here.
  • Linsn LED software LEDStudio, LEDSet, etc: For Linsn control system. Download here.

After that, install the software and run it on the computer. Generally, you will get the configuration from the LED screen supplier and the file is already saved to all receiver cards of the cabinets. So you can import the file directly into the software when setting up the screen.

But if you don’t have it or have lost the file, you can still create it using the smart setting function of the debug software. These files are mainly named RCG(Linsn), RCFGX(Novastar), or RCVBP(Colorlight) files. Here is some guide you can follow:

After confirming that the configuration is operating correctly, you can send a program to check whether it can display a whole image. 

Step 9: Follow-up inspection

After the outdoor LED display is configured, you still need to look into it carefully to ensure the LED video wall is a normal working condition. Some aspects you need to pay attention to:

  • Environment Abnormal (Is it necessary to be windproof and waterproof?)
  • Overall Steel structure (Loose or solid)
  • Is the cable safe?

After that, the whole Outdoor LED display Installation with cabinet is done.

Indoor LED Display Installation without Cabinet

This installation way involves utilizing individual LED modules mounted directly onto a frame, providing a flexible and customizable solution for various environments. It also eliminates the need for bulky cabinets, allowing for a more streamlined appearance and easier integration into existing architecture. However, you have to assemble LED modules, LED powers, LED receiver cards, and other components.

Advantages

  • More cost-effective, as it reduces the material costs associated with cabinetry
  • Enables precise control over the display size by adjusting it in module increments, whereas cabinet-based installations are limited to fixed cabinet sizes.
  • Make the most of the LED receiver card, and LED power supply, as Cabinet-based installations only allow the receiver card and power supply to be utilized for a separate cabinet.
  • The LED screen looks simpler and thinner.

Disadvantages

  • Need more labor and cost to assemble all components.
  • Without protective cabinets, the LED modules are more exposed to potential damage from impacts or environmental factors
  • More complex, requiring precision to ensure that all modules are aligned correctly and that the connections are secure.
  • Need higher maintenance cost and time.
  • May cause low flatness if the screen is large.
  • Only suitable for indoor installation.

Next, we will explore the process for implementing indoor LED display installations without the use of cabinets.

Step 1: Prepare all Necessary Materials

First, we need to prepare all materials. This is a complete material list for an indoor LED screen installation where the LED modules are mounted on a frame.

  • Ethernet cables
  • AC Power Cables
  • RED Black Power Cable
  • Flat Signal Cable
  • LED Modules
  • LED Receiver Cards
  • LED Sender or LED Video Processor
  • A laptop with debug software installed
  • Bolts
  • Wrench 
  • Rectangular Tubes

Step 2: Make & Install Steel Frame

Once all materials are prepared, the next step is to create a steel frame. This is a crucial step that ensures structural integrity and support for the LED modules.

LED display steel frame

Calculate the Size of LED screen

The frame should be designed to accommodate the dimensions of the LED modules. For example, Assuming the LED module you are using has a size of 320*160mm, the dimensions formula as follows:

Height =Quantity of LED modules in vertical * LED modules height
Weight=Quantity of LED modules in horizontal* LED modules Width

To calculate the height of the LED screen, multiply the number of LED modules arranged vertically by the height of each module. For instance, if there are 5 modules stacked vertically, each measuring 0.16 meters, the total height of the screen would be 0.9 meters.

Similarly, the width of the LED screen can be determined by multiplying the number of horizontal modules by the width of each module. If there are 10 modules arranged horizontally, each with a width of 0.32 meters, the total width of the screen would be 3.2 meters.

Accounting for Gaps

Generally, you need to consider the slight gaps and seams that occur between modules and the frame, typically around 10mm. These gaps can affect the overall dimensions of the frame, so it’s important to add the total potential spacing to both the vertical and horizontal calculations.

Final Frame Adjustments

After calculating the total height and width, including the gaps, the final frame dimensions can be determined. In our example, the final size of the whole frame should be:

Width: 3200mm + 10mm = 3210mm

Height: 900mm + 10mm = 910mm

Building the Steel Frame

After we have calculated the size of the frame, you can now welding steel structure with rectangular tubes, which is generally 40x40mm or 40x20mm size.

Each module and power supply contributes to the overall weight, so it’s important to ensure that the frame is robust enough to support the total weight of the LED display.

Installing the steel structure

After the steel structure is welded, we need to install the steel structure on the wall. First we need to align the frame with the marked reference points and secure it in place using heavy-duty bolts and anchors. Then we need to ensure that each connection is tight and the frame is level, making any necessary adjustments before fully tightening the bolts. 

Once the frame is securely attached, it’s advisable to perform a final inspection to confirm that it is stable and properly aligned. 

Installing the steel structure of LED screen

Step 3: Install the Power Supply

After the steel  frame is installed on the wall, the next step is to install the power suppies.

Connecting DC5v cable to the Power Supply

Before we install the power supply to the steel frame, we need the connect the DV5V cable to the power supply. 

Performing this connection prior to mounting simplifies the process significantly, especially if the power supply is positioned at a height where access could be not easy.  By connecting the DC5V cable at ground level, you can ensure a secure and efficient installation, reducing the risk of errors that could occur when working in a constrained space.

Typically, the DC5V cable consists of two wires: a red cable for the positive connection and a black cable for the negative connection. To make the connections, attach the red cable to the “+” terminal of the power output and the black cable to the “-” terminal.

connect DV5V cable to LED screen power supply

Installing the Power Supply to the Steel Frame

Once the DC5V cable is securely connected to the power supply, you can then proceed to mount the power supply onto the steel frame.

First, we need to calculate the load of the power supply to determine how many LED modules can be supported, both horizontally and vertically, based on the power supply’s capacity. 

Genearlly there is a standard you can follow:

1pcs AC 200W power supply (5V, 40A, and 200W) can load 4pcs LED module
1pcs AC 300W power supply (5V, 60A, and 300W) can load 6pcs LED module

Next, you need to decide the position of LED power supply according the quantity of LED module in horizontal and vertical direction.

Once the position is confirmed, we can place the power supply to be securely fastened to the rectangular tube using fixing straps or mounted to the side of the rectangular tube or the wall using fixing brackets (with screws) and self-tapping screws. 

Installa the led screen power supply to the steel frame

In additional, please ensure the connections should be secure and that power supply is adequately grounded to prevent any electrical issues.

Connecting AC Cables

After mounting, you can connect the AC power cable from the main power source to the power supply, and you have to ensure that all electrical safety protocols are followed.

To connect the AC cable to the power supply, start by linking the power supply to the air switch terminal of the distribution cabinet. From there, you can connect adjacent power supplies in a chain configuration, allowing for a streamlined distribution of power across multiple units.

AC power cable connection for LED Screen installation

It’s important to use a 3-core 2.5mm² cable for these connections, which can support a maximum of 12 units of 300W power each. If your setup exceeds this capacity, you will need to use an additional AC cable to connect another power supply, and you need to start a new chain. As you connect the power supplies, make sure to verify that all connections are secure and properly insulated to prevent any electrical hazards.

Step 4: Install LED Receiver Cards & Cables

The installation of the receiving card is a crucial step in ensuring that the LED display functions correctly and receives the necessary data signals.

Connect Flat cable to Receiver Card

Typically, before installing the receiver card onto the steel frame, we should first connect the flat signal data to the card. using pin interface J1, J2, J3, J4… etc. the qunaity of interface depeond on the receiver card, you need to check the corresponding specification from the manufacture.

Also, you need to follow the connection ways according to the order of the configuration file which is mostly given by the LED supplier.

Connect DC cable to Receiver Card

After that, you need to connect a DV5V cable to the receiver card too, the cable will be soon connect the power supply 

Install Receiver Card to the Steel Frame

Once the receiver card is assembled with all cables, the next step is to install them to the steel frame.

Obviously, It is better to secure the receiving card to the designated area on the steel frame, typically near the power supply for easier cable management. Additionally, you also need to check the length of the DC power cables connected in the previous step; they should be long enough to reach the power supply without creating tension or strain.

Similarly, You can fix the receiver card to the side of the rectangular tube using fixing straps or mount it to the wall using fixing plates and screws. 

Install Receiver Card to the Steel Frame

Install Receiver Card to the Steel Frame

Connect Ethernet cable

After the receiver card is mounted on the steel frame, you can connect the network cable or ethernet cable to the receiver card to ensure seamless communication between the LED display modules.

Connect Ethernet cable to the led screen receiver card

Connect Ethernet cable to the led screen receiver card

The connection process typically involves linking one receiver card’s output to the input of the next receiver card. Generally, there are two Ethernet ports, You can connect to the Ethernet cable from one port of the receiver card to one port of the next card in the series. Additionally, you need to follow the connection sequence specified in the designed wiring diagram if there is one.

network port of LED screen receiver card

Two Network Ports of LED Screen Receiver Card

After all Ethernet connections are made, it’s crucial to conduct a final verification of the entire setup. Inspect each connection point to ensure that the cables are securely attached and that there are no visible signs of damage.

Step 5: Install LED Screen Modules

Before installing LED screen modules directly onto a steel frame without cabinets, it’s important to ensure that the frame is clean and free of debris to facilitate proper alignment. Also, we should assemble the modules with the magnets before proceeding to the next steps.

Mounting the LED Screen Modules

Then, we can mount the LED modules at one corner of the frame, securing each module with the appropriate brackets. We also need to connect the flat cable from the receiving card and the DC5V cable from the power output of the power supply. Please ensure the arrow on the back of each module points upwards and to the right as you attach it to the steel structure. In the meantime, you need to check that there are no gaps between modules for a seamless appearance and to maintain a tight fit.

install LED screen modules to steel frame

Install LED screen modules to steel frame

Key Considerations for LED Module Installation

  • Test all connections between LED modules which connected to the receiver card, ensure there is no problem, and then continue with other LED modules.
  • Utilize cable ties to keep the cables neatly arranged and prevent tangling.
  • Be mindful of potential uneven screens during installation.
  • Ensure there are no gaps between adjacent modules.

Once all modules are installed, perform a thorough inspection of all LED modules. Make sure there are no flatness issues.

Step 6: Configure LED Screen

Once the LED modules are securely mounted on the steel frame, the next step is to configure and test the LED screen for optimal performance.

Power on the LED screen. Press the test button on the receiver card and the screen will show the following one by one:

  • Red
  • Green
  • Blue
  • Line
  • Field
  • Point information

After that, the next focus should be on receiver card setting and screen connection.  You need to access the display’s configuration software, which is typically provided by the manufacturer. You may also import the configuration file provided by the supplier for convenience. Carefully follow the instructions in the configuration software to map each receiver card according to its physical location on the steel frame. 

Here is some useful guide you can following:

Once the configuration and mapping are complete, conduct thorough testing to ensure that the LED screen operates as expected. Finally, create a large-screen unified image after being configured.

Useful Tips

Here are some useful tips for installing an LED screen: 

  • Know Your Dimensions: Be clear about the overall size of the display, the dimensions of each module, the total number of modules, as well as the number of power supplies and receiving cards.
  • Minimize Impact Risks: Take precautions to avoid bumping against the edges of the screen to prevent any LED modules from falling or getting damaged.
  • Understand Power Load: Be aware of the power load requirements for each module and ensure that the power supplies are appropriately rated to handle the total load safely.
  • Organize Cables: Use cable ties to keep all power and data cables organized, reducing clutter and the risk of accidental disconnections.
  • Check Connections: Before powering on the system, double-check all connections to ensure they are secure and correctly configured.
  • Test Before Finalizing: Conduct initial tests to check for proper functioning of all modules before finalizing the installation.
  • Maintain Ventilation: Ensure that there is adequate airflow around the display to prevent overheating of the modules and power supplies.
  • Plan for Maintenance: Consider accessibility for future maintenance tasks, ensuring that you can easily reach all components if needed.

Resource

Setting up an LED screen is one crucial step of LED screen installation. Here is the download link for various control software; you can choose to download the one that corresponds to your control system.

Conclusion

In this post, we have learned about the essential steps involved in installing an LED screen without cabinets, emphasizing the importance of preparation and careful configuration. We also covered some useful tips to ensure a smooth installation process, such as connecting cables, mounting LED modules, and installing receiver cards effectively.

Additionally, we explored the detailed steps for various installation ways. By following these guidelines, you can install a reliable and visually appealing LED display that meets your project’s needs. If you still have any problems about how to install a LED screen. Send us a message now.

A full Guide to LED Screen Installation

Explore the steps for LED screen installation for multiple installation ways, and useful tips to ensure a smooth installation process.
LED Screen Installation

Would you like to know all the steps for LED screen installation?

Installing an LED screen is not an easy task, and the process might look complex. In this post, we will discuss the essential steps. While it may seem straightforward, there are common mistakes that can complicate the process.

We’ll break down the steps to show you how to navigate the installation efficiently, turning what looks like a daunting task into a simple and rewarding project. By the end of this guide, you’ll have the confidence to install your LED screen successfully!

In This Article

Type of Installation Ways

Before we explore the installation steps, it’s essential to have a basic understanding of the different installation ways, as each may require distinct s materials and steps.

Generally, when installing your LED screens, there are five primary types as follows to consider.

  • Cabinets mounted on a steel structure
  • Cabinets installed directly on walls
  • Cabinets positioned on brackets
  • Cabinets suspended from hanging bars
  • LED modules assembled directly onto a steel structure

Next, we conduct an in-depth analysis of each installation method.

Outdoor Installation with cabinet on a steel structure

The LED screen cabinet is a standalone display unit that comes pre-integrated with LED modules, power supplies, receiver cards, data cables, power cables, and HUB cards. This design allows operators to easily connect the cabinets together, much like assembling building blocks. Operators can efficiently create larger displays without the complexities typically associated with traditional setups.

fixed installation LED display cabinet structure

The advantages of this installation method are:

  • Cabinet-based installations provide enhanced protection for the LED modules, as the sturdy enclosures shield them from physical damage and environmental exposure.
  • The modularity of the LED cabinets simplifies the installation process.
  • Convenient for transportation.
  • Quick assembly and configuration.
  • Easy cable connection.
  • More stable, high protection for inner components.

Disadvantages:

  •  High cost.
  • Need more space.

Outdoor LED display installation using cabinets mounted on a steel structure requires meticulous planning and execution to ensure both functionality and durability. You need to consider which way (Single-column installation, double-column installation, wall-mounted installation, standing installation, hanging installation, etc) is more suitable for the location where the LED screen will be installed.

Step 1: Survey the site environment

Before installing your LED display, it’s essential to conduct a thorough survey of the intended location. You need to consider environmental factors and space factors that can accommodate the steel structure. You need to evaluate the building’s load-bearing strength to support the total LED display’s weight and dimensions securely.

Additionally, You will need to consider the following aspects of the location you chose for your LED screen:

  • Topographic factors
  • Chances of rain and storm
  • The max and min temperature
  • The max and min wind force
  • Ambient light
  • Potential obstructions like trees or buildings
LED Screen installation ways

Meantime, take into account power supply accessibility and network connectivity required for content updates.  

Step 2:Calculate the Size of the LED Screen

After completing the survey, the next step is to calculate the size of the LED display, including the dimensions of the cabinets and the total frame size. It’s crucial to ensure the installation site has sufficient space to accommodate both the frame and the LED display itself. 

Begin by determining the overall screen size needed for optimal visibility and impact. Then, consider the dimensions of each LED cabinet, adding them up to ascertain the full extent of the display area. 

Finally, incorporate the size of the supporting steel frame, ensuring stability and safety. 

Step 3: Prepare Material

Once you have surveyed the Location, next is to organize the LED cabinets, steel frames, and any auxiliary components required for integration, ensuring that everything is on-site before starting the installation to avoid interruptions. Some necessary tools and materials you need are as follows: 

  • LED screen cabinets
  • Power cable
  • Data Network cable
  • USB Control Cable
  • DVI/HDMI/VGA Cable
  • Steel Structure
  • Bolts
  • Connect plates
  • Spanner
  • Laptop
  • LED Controller or Video Processor
  • Welding equipment, power drills, fasteners, and safety gear like helmets and harnesses for workers
material and accessories for LED display installation

Step 4: Build the Frame According on Measurements

After completing the site survey and determining the ideal location for the LED screen, the next step is to build the frame based on the measurements obtained.

Using 4×4 cm or 4×8 cm rectangular tubes for the main structure, weld the pieces together to create a robust frame that can support the weight of the LED cabinets. It’s important to ensure that the frame is level and securely anchored to withstand environmental factors such as wind and rain.

Building the frame involves careful consideration of maintenance access, which is crucial for efficient servicing. If the design includes rear service access, ensure to leave maintenance channels of 600mm to 900mm in the frame, allowing technicians to easily reach and repair components from the back.

steel frame for LED display installation

On the other hand, if the display is front-serviceable, a dedicated maintenance room at the back may not be necessary.

Step 5: Fix LED cabinet on the Steel structure

Once the steel frame is securely built, the next step is to fix the LED cabinets onto it.

fixed installation LED display cabinet structure

LED Cabinet

LED display cabinet mounted on the steel frame

Steel Frame with LED Cabinet Mounted

Here are the basic steps for fixing the LED cabinets onto the steel frame:

  • Position the Cabinets: Carefully place each LED cabinet on the steel frame, ensuring proper alignment and levelness.
  • Temporary Support: Use temporary supports or clamps to hold the cabinets in place as you prepare for securing.
  • Attach Connection Plates: Secure the cabinets to the frame using connection plates behind the 40x40mm rectangular tube, ensuring they fit snugly against the frame.
  • Bolt the Cabinets: Use M10 x 60mm bolts pass through the connecting plate and the rectangular tube to fasten each cabinet to the frame at all connection points.
  • Evenly Distribute Bolts: Tighten bolts evenly across all connection points to avoid stress and ensure stability.
  • Inspect Connections: Check each cabinet to confirm that all connections are secure and that there are no gaps between the units.
  • Prepare for Wiring: Once secured, prepare to connect the necessary signal and power cables for the LED screen.
Fix LED cabinets to the frame using connection plates with steel tube

Fix LED cabinets to the frame using connection plates with steel tube

Finally, inspect each cabinet after installation to confirm that all connections are secure and that there are no gaps between the units. This inspection is crucial for ensuring proper weatherproofing and preventing moisture from entering the cabinets, especially in outdoor environments.

Once everything is securely fastened and inspected, you can proceed to connect the necessary signal and power cables, setting the stage for the configuration and testing of the LED screen.

Step 6: Connect AC Power Cable

After the LED cabinets are fixed on the steel structure, next is to link power cable to all cabinets.

To fix the AC power cable for the LED cabinet, start by identifying the two power connector ports, some cabinets are with labeled POWER IN and POWER OUT located on the back of the cabinet.

LED screen cabinet power connector port

Generally, there are two power connector ports in the cabinet. We use the AC power Cable to connect the power distribution box to the first cabinet. The first POWER port is designed to receive the main power supply, while another POWER port allows for daisy-chaining additional cabinets or connecting to the next unit in the series.  

AC Power cable connection with LED display

 After securing all connections, it’s essential to conduct a thorough inspection to confirm that everything is properly wired and safe before powering on the system. Here are some standards you need to follow: 

  • AC Power Cable: 3-core 2.5㎡.
  • Wiring configuration: typically, the brown wire should connect to live, the blue wire to neutral, and the yellow-green wire to earth.
  • Load of Power Cable: 3.6KW.

As you can see above, the load of power cable is generally about 3.6KW, so how many cabinets can one AC power cable load? 

To determine how many cabinets one power cable can load based on the given power capacity, we start with the total power that each cabinet requires. Here is a simple formula:

Assuming each cabinet has three 300W power supplies, the total power required for each cabinet would be calculated as follows:

Total Power of Each Cabinet=Number of Power Supplies×Power of Each Supply=3×300W=900W

Given that the load capacity of the power cable is approximately 3.6KW (or 3600W), we can then calculate the number of cabinets that can be powered by one cable:

Number of Cabinets=Total Load Capacity / Total Power of Each Cabinet​=3600W / 900W​=4

Thus, one power cable can support up to 4 cabinets with each cabinet requiring 900W of power. You can use the same formula for 200W Power suppliers.

Step 7: Connect Signal Cable

After the power cable is OK, the next step is to connect the signal cable to the LED display. It is a crucial step in ensuring that the content (Video, text, images, etc ) is transmitted effectively from the control system to the cabinets.

First, connect the laptop, which will serve as the primary source for the video signal, to the LED controller using the appropriate signal cables, which may include HDMI, DVI, or ethernet cable, then connect the output of the controller to the input of the first LED cabinet using the ethernet cables.

led display structure diagram

Once the first cabinet is connected, proceed to daisy-chain the signal to the subsequent cabinets. This typically involves connecting the output port of the first cabinet to the input port of the next cabinet, continuing this process until all cabinets in the installation are linked.

As we know, each output port of the LED controller has a value of Max pixel pitch loading capacity (Max pixel in width and Max pixel in height), so make sure the the total pixel pitchs of cabinets in series must in the range of that value.

Step 8: Configure LED Screen and Send Program

Once all physical connections are made, the next task is to power on the LED display and confirm that each cabinet is functioning correctly. This involves using debugging software to configure the LED screen, which typically comes with the LED control system.

Novastar NovaLCT Screen Configuration

LED Screen Configuration

Here is a list of software you can download to correspond with the control system your LED display uses.

  • Colorlight LED software LEDVsion, iSet, etc: For Colorlight control system. Download here.
  • Novastar LED software NovaLCT, SmartLCT, etc: For Novastar control system. Download here.
  • HUIDU LED software HDPlayer, HDSet, etc: For Huidu control system. Download here.
  • Linsn LED software LEDStudio, LEDSet, etc: For Linsn control system. Download here.

After that, install the software and run it on the computer. Generally, you will get the configuration from the LED screen supplier and the file is already saved to all receiver cards of the cabinets. So you can import the file directly into the software when setting up the screen.

But if you don’t have it or have lost the file, you can still create it using the smart setting function of the debug software. These files are mainly named RCG(Linsn), RCFGX(Novastar), or RCVBP(Colorlight) files. Here is some guide you can follow:

After confirming that the configuration is operating correctly, you can send a program to check whether it can display a whole image. 

Step 9: Follow-up inspection

After the outdoor LED display is configured, you still need to look into it carefully to ensure the LED video wall is a normal working condition. Some aspects you need to pay attention to:

  • Environment Abnormal (Is it necessary to be windproof and waterproof?)
  • Overall Steel structure (Loose or solid)
  • Is the cable safe?

After that, the whole Outdoor LED display Installation with cabinet is done.

Indoor LED Display Installation without Cabinet

This installation way involves utilizing individual LED modules mounted directly onto a frame, providing a flexible and customizable solution for various environments. It also eliminates the need for bulky cabinets, allowing for a more streamlined appearance and easier integration into existing architecture. However, you have to assemble LED modules, LED powers, LED receiver cards, and other components.

Advantages

  • More cost-effective, as it reduces the material costs associated with cabinetry
  • Enables precise control over the display size by adjusting it in module increments, whereas cabinet-based installations are limited to fixed cabinet sizes.
  • Make the most of the LED receiver card, and LED power supply, as Cabinet-based installations only allow the receiver card and power supply to be utilized for a separate cabinet.
  • The LED screen looks simpler and thinner.

Disadvantages

  • Need more labor and cost to assemble all components.
  • Without protective cabinets, the LED modules are more exposed to potential damage from impacts or environmental factors
  • More complex, requiring precision to ensure that all modules are aligned correctly and that the connections are secure.
  • Need higher maintenance cost and time.
  • May cause low flatness if the screen is large.
  • Only suitable for indoor installation.

Next, we will explore the process for implementing indoor LED display installations without the use of cabinets.

Step 1: Prepare all Necessary Materials

First, we need to prepare all materials. This is a complete material list for an indoor LED screen installation where the LED modules are mounted on a frame.

  • Ethernet cables
  • AC Power Cables
  • RED Black Power Cable
  • Flat Signal Cable
  • LED Modules
  • LED Receiver Cards
  • LED Sender or LED Video Processor
  • A laptop with debug software installed
  • Bolts
  • Wrench 
  • Rectangular Tubes

Step 2: Make & Install Steel Frame

Once all materials are prepared, the next step is to create a steel frame. This is a crucial step that ensures structural integrity and support for the LED modules.

LED display steel frame

Calculate the Size of LED screen

The frame should be designed to accommodate the dimensions of the LED modules. For example, Assuming the LED module you are using has a size of 320*160mm, the dimensions formula as follows:

Height =Quantity of LED modules in vertical * LED modules height
Weight=Quantity of LED modules in horizontal* LED modules Width

To calculate the height of the LED screen, multiply the number of LED modules arranged vertically by the height of each module. For instance, if there are 5 modules stacked vertically, each measuring 0.16 meters, the total height of the screen would be 0.9 meters.

Similarly, the width of the LED screen can be determined by multiplying the number of horizontal modules by the width of each module. If there are 10 modules arranged horizontally, each with a width of 0.32 meters, the total width of the screen would be 3.2 meters.

Accounting for Gaps

Generally, you need to consider the slight gaps and seams that occur between modules and the frame, typically around 10mm. These gaps can affect the overall dimensions of the frame, so it’s important to add the total potential spacing to both the vertical and horizontal calculations.

Final Frame Adjustments

After calculating the total height and width, including the gaps, the final frame dimensions can be determined. In our example, the final size of the whole frame should be:

Width: 3200mm + 10mm = 3210mm

Height: 900mm + 10mm = 910mm

Building the Steel Frame

After we have calculated the size of the frame, you can now welding steel structure with rectangular tubes, which is generally 40x40mm or 40x20mm size.

Each module and power supply contributes to the overall weight, so it’s important to ensure that the frame is robust enough to support the total weight of the LED display.

Installing the steel structure

After the steel structure is welded, we need to install the steel structure on the wall. First we need to align the frame with the marked reference points and secure it in place using heavy-duty bolts and anchors. Then we need to ensure that each connection is tight and the frame is level, making any necessary adjustments before fully tightening the bolts. 

Once the frame is securely attached, it’s advisable to perform a final inspection to confirm that it is stable and properly aligned. 

Installing the steel structure of LED screen

Step 3: Install the Power Supply

After the steel  frame is installed on the wall, the next step is to install the power suppies.

Connecting DC5v cable to the Power Supply

Before we install the power supply to the steel frame, we need the connect the DV5V cable to the power supply. 

Performing this connection prior to mounting simplifies the process significantly, especially if the power supply is positioned at a height where access could be not easy.  By connecting the DC5V cable at ground level, you can ensure a secure and efficient installation, reducing the risk of errors that could occur when working in a constrained space.

Typically, the DC5V cable consists of two wires: a red cable for the positive connection and a black cable for the negative connection. To make the connections, attach the red cable to the “+” terminal of the power output and the black cable to the “-” terminal.

connect DV5V cable to LED screen power supply

Installing the Power Supply to the Steel Frame

Once the DC5V cable is securely connected to the power supply, you can then proceed to mount the power supply onto the steel frame.

First, we need to calculate the load of the power supply to determine how many LED modules can be supported, both horizontally and vertically, based on the power supply’s capacity. 

Genearlly there is a standard you can follow:

1pcs AC 200W power supply (5V, 40A, and 200W) can load 4pcs LED module
1pcs AC 300W power supply (5V, 60A, and 300W) can load 6pcs LED module

Next, you need to decide the position of LED power supply according the quantity of LED module in horizontal and vertical direction.

Once the position is confirmed, we can place the power supply to be securely fastened to the rectangular tube using fixing straps or mounted to the side of the rectangular tube or the wall using fixing brackets (with screws) and self-tapping screws. 

Installa the led screen power supply to the steel frame

In additional, please ensure the connections should be secure and that power supply is adequately grounded to prevent any electrical issues.

Connecting AC Cables

After mounting, you can connect the AC power cable from the main power source to the power supply, and you have to ensure that all electrical safety protocols are followed.

To connect the AC cable to the power supply, start by linking the power supply to the air switch terminal of the distribution cabinet. From there, you can connect adjacent power supplies in a chain configuration, allowing for a streamlined distribution of power across multiple units.

AC power cable connection for LED Screen installation

It’s important to use a 3-core 2.5mm² cable for these connections, which can support a maximum of 12 units of 300W power each. If your setup exceeds this capacity, you will need to use an additional AC cable to connect another power supply, and you need to start a new chain. As you connect the power supplies, make sure to verify that all connections are secure and properly insulated to prevent any electrical hazards.

Step 4: Install LED Receiver Cards & Cables

The installation of the receiving card is a crucial step in ensuring that the LED display functions correctly and receives the necessary data signals.

Connect Flat cable to Receiver Card

Typically, before installing the receiver card onto the steel frame, we should first connect the flat signal data to the card. using pin interface J1, J2, J3, J4… etc. the qunaity of interface depeond on the receiver card, you need to check the corresponding specification from the manufacture.

Also, you need to follow the connection ways according to the order of the configuration file which is mostly given by the LED supplier.

Connect DC cable to Receiver Card

After that, you need to connect a DV5V cable to the receiver card too, the cable will be soon connect the power supply 

Install Receiver Card to the Steel Frame

Once the receiver card is assembled with all cables, the next step is to install them to the steel frame.

Obviously, It is better to secure the receiving card to the designated area on the steel frame, typically near the power supply for easier cable management. Additionally, you also need to check the length of the DC power cables connected in the previous step; they should be long enough to reach the power supply without creating tension or strain.

Similarly, You can fix the receiver card to the side of the rectangular tube using fixing straps or mount it to the wall using fixing plates and screws. 

Install Receiver Card to the Steel Frame

Install Receiver Card to the Steel Frame

Connect Ethernet cable

After the receiver card is mounted on the steel frame, you can connect the network cable or ethernet cable to the receiver card to ensure seamless communication between the LED display modules.

Connect Ethernet cable to the led screen receiver card

Connect Ethernet cable to the led screen receiver card

The connection process typically involves linking one receiver card’s output to the input of the next receiver card. Generally, there are two Ethernet ports, You can connect to the Ethernet cable from one port of the receiver card to one port of the next card in the series. Additionally, you need to follow the connection sequence specified in the designed wiring diagram if there is one.

network port of LED screen receiver card

Two Network Ports of LED Screen Receiver Card

After all Ethernet connections are made, it’s crucial to conduct a final verification of the entire setup. Inspect each connection point to ensure that the cables are securely attached and that there are no visible signs of damage.

Step 5: Install LED Screen Modules

Before installing LED screen modules directly onto a steel frame without cabinets, it’s important to ensure that the frame is clean and free of debris to facilitate proper alignment. Also, we should assemble the modules with the magnets before proceeding to the next steps.

Mounting the LED Screen Modules

Then, we can mount the LED modules at one corner of the frame, securing each module with the appropriate brackets. We also need to connect the flat cable from the receiving card and the DC5V cable from the power output of the power supply. Please ensure the arrow on the back of each module points upwards and to the right as you attach it to the steel structure. In the meantime, you need to check that there are no gaps between modules for a seamless appearance and to maintain a tight fit.

install LED screen modules to steel frame

Install LED screen modules to steel frame

Key Considerations for LED Module Installation

  • Test all connections between LED modules which connected to the receiver card, ensure there is no problem, and then continue with other LED modules.
  • Utilize cable ties to keep the cables neatly arranged and prevent tangling.
  • Be mindful of potential uneven screens during installation.
  • Ensure there are no gaps between adjacent modules.

Once all modules are installed, perform a thorough inspection of all LED modules. Make sure there are no flatness issues.

Step 6: Configure LED Screen

Once the LED modules are securely mounted on the steel frame, the next step is to configure and test the LED screen for optimal performance.

Power on the LED screen. Press the test button on the receiver card and the screen will show the following one by one:

  • Red
  • Green
  • Blue
  • Line
  • Field
  • Point information

After that, the next focus should be on receiver card setting and screen connection.  You need to access the display’s configuration software, which is typically provided by the manufacturer. You may also import the configuration file provided by the supplier for convenience. Carefully follow the instructions in the configuration software to map each receiver card according to its physical location on the steel frame. 

Here is some useful guide you can following:

Once the configuration and mapping are complete, conduct thorough testing to ensure that the LED screen operates as expected. Finally, create a large-screen unified image after being configured.

Useful Tips

Here are some useful tips for installing an LED screen: 

  • Know Your Dimensions: Be clear about the overall size of the display, the dimensions of each module, the total number of modules, as well as the number of power supplies and receiving cards.
  • Minimize Impact Risks: Take precautions to avoid bumping against the edges of the screen to prevent any LED modules from falling or getting damaged.
  • Understand Power Load: Be aware of the power load requirements for each module and ensure that the power supplies are appropriately rated to handle the total load safely.
  • Organize Cables: Use cable ties to keep all power and data cables organized, reducing clutter and the risk of accidental disconnections.
  • Check Connections: Before powering on the system, double-check all connections to ensure they are secure and correctly configured.
  • Test Before Finalizing: Conduct initial tests to check for proper functioning of all modules before finalizing the installation.
  • Maintain Ventilation: Ensure that there is adequate airflow around the display to prevent overheating of the modules and power supplies.
  • Plan for Maintenance: Consider accessibility for future maintenance tasks, ensuring that you can easily reach all components if needed.

Resource

Setting up an LED screen is one crucial step of LED screen installation. Here is the download link for various control software; you can choose to download the one that corresponds to your control system.

Conclusion

In this post, we have learned about the essential steps involved in installing an LED screen without cabinets, emphasizing the importance of preparation and careful configuration. We also covered some useful tips to ensure a smooth installation process, such as connecting cables, mounting LED modules, and installing receiver cards effectively.

Additionally, we explored the detailed steps for various installation ways. By following these guidelines, you can install a reliable and visually appealing LED display that meets your project’s needs. If you still have any problems about how to install a LED screen. Send us a message now.